Advanced Construction Estimation Engine
Phase 1.1 ProProgressive structural & finishing calculations: Plot → Grey Structure → Finishing → Labour → Budget
Covered Areasqft
Floors
Quality
Estimated Grey Structure Shell Cost
Rs. 4,773,510
Rate: Rs. 2387 / sqft•Total Concrete: 1588 CFT
Itemized Structural Materials (Required vs Wastage vs Final)
Excludes Finishing Items| Material | Required | Wastage % | Final Quantity | Unit Rate | Total Cost |
|---|---|---|---|---|---|
| Portland Cement (50kg Bags) | 378 bags | +3% | 390 bags | Rs. 1450 | Rs. 565,500 |
| Ravi / Chenab Sand (Rait) | 1,218 CFT | +5% | 1,279 CFT | Rs. 45 | Rs. 57,555 |
| Margalla / Sargodha Crush (Bajri) | 1,397 CFT | +5% | 1,467 CFT | Rs. 95 | Rs. 139,365 |
| Awwal Red Clay Bricks | 52,000 nos | +5% | 54,600 nos | Rs. 14.5 | Rs. 791,700 |
| Deformed Grade 60 Steel (Saria) | 7,700 kg | +4% | 8,008 kg | Rs. 260 | Rs. 2,082,080 |
Foundation & PCC
Rs. 763,762
Columns & Beams
Rs. 1,241,112
Roof Slabs
Rs. 1,336,583
Brick Masonry
Rs. 954,702
Live Takeoff Summary
grey ViewGrey Structure Shell
Rs. 4,773,510
Rs. 2,387/sqft•2,000 sqft (2 Flr)•standard
Phase AllocationTurnkey: Rs. 9,491,265
Grey 38%
Fin 36%
Lab 19%
Cont 7%
Key Material Bill (Grey Shell)
Cement (OPC/SRC)
390 bagsRs. 565,500
Steel Rebar (Grade 60)
8.01 tonsRs. 2,082,080
Clay Bricks (Awwal)
54,600 pcsRs. 791,700
Sand (Chenab)1,279 CFT
Crush (Margalla)1,467 CFT
Estimated Timeline
~4.1 MonthsBased on 6 days/week work schedule with 3 masons & 5 helpers.
All estimates follow Pakistan Building Code standards (PBC-2021). Actual structural drawings from a licensed PEC civil engineer supersede generic estimates.